{"product_id":"double-dog-leash-no-tangle-splitter-for-two-dogs-coupler-with-adjustable-long-lead-rope-dual-control-handles-retractable-no-pull-bungee-walk-train-small-medium-large-2-pets-green-color-green","title":"Double Dog Leash - No Tangle Splitter for Two Dogs, Coupler with Adjustable Long Lead Rope, Dual Control Handles, Retractable No Pull Bungee, Walk Train Small Medium Large 2 Pets (Green) - color: Green","description":"\u003ch3\u003eAbout this item\u003c\/h3\u003e\u003cul\u003e\n\u003cli\u003e【Adjustable Buckle \u0026amp; Extensible Rope for Multi-Use】 – Size of the Coupler: \u0026lt;2.1-3.1 ft \u0026gt; \/ \u0026lt;25.6-27.4 in\u0026gt; \/ \u0026lt;65-95 cm\u0026gt;. Each rope is equipped with an Adjustable Buckle, so you can freely adjust the length when training, walking, running, or hiking with your furry friends. The Retractable Shock-Absorbing leash effectively reduces strain on your arms and shoulders when your dog suddenly lunges or changes direction, ensuring a more comfortable experience for both the dog and the walker.\u003c\/li\u003e\n\u003cli\u003e【360°Swivel Clip for Tangle-Free】 – The Splitter is equipped with a 360° Rotating Buckle, allowing for quick release and locking, preventing twisting or knotting. This ensures your dog’s freedom of movement, giving them more space while aving you time from having to untangle the leash as they move from side to side.\u003c\/li\u003e\n\u003cli\u003e【Traffic Control Handle \u0026amp; Reflective Strap for Safety】 – The Handle near the dog's neck is ergonomically designed with soft, thickened sponge padding for a comfortable grip. The non-slip design ensures a firm hold, providing better control over your dog in any situation. Reflective Threads improve visibility, keeping you and your dog safe during nighttime walks.\u003c\/li\u003e\n\u003cli\u003e【Heavy-Duty Clip \u0026amp; Durable Leash Material】 – The Metal Hook is made from durable and rust-proof galvanized zinc alloy. The leash is crafted from high-strength Climbing-Grade Nylon, ensuring exceptional durability and resistance to chewing and tearing. Reinforced Stitching enhances longevity, making it ideal for daily walks, training, and outdoor adventures.\u003c\/li\u003e\n\u003cli\u003e【Premium Quality \u0026amp; Timely Service】 – At LEOSASA, we are committed to providing premium products that enhance the safety, comfort, and happiness of both you and your dog. If you have any questions, please reach out to us, and we will provide you with a satisfactory solution within 24 hours.\u003c\/li\u003e\n\u003c\/ul\u003e\u003ch3\u003eOverview\u003c\/h3\u003e\u003cul\u003e\n\u003cli\u003e\n\u003cstrong\u003eSize:\u003c\/strong\u003e 2.1-3.1 ft \/ 25.6-27.4 in \/ 65-95 cm\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eColor:\u003c\/strong\u003e Green\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eBrand:\u003c\/strong\u003e LEOSASA\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eMaterial:\u003c\/strong\u003e Alloy Steel, Nylon\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003ePattern:\u003c\/strong\u003e Solid\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003ePackage Dimensions ‏:\u003c\/strong\u003e ‎ 8.82 x 4.21 x 1.69 inches; 7.37 ounces\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eItem model number ‏:\u003c\/strong\u003e ‎ 1V2-Y-GREEN\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eDate First Available ‏:\u003c\/strong\u003e ‎ March 19, 2025\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eManufacturer ‏:\u003c\/strong\u003e ‎ LEOSASA\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eASIN ‏:\u003c\/strong\u003e ‎ B0F1XWHZNX\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eBest Sellers Rank:\u003c\/strong\u003e #34,185 in Pet Supplies (See Top 100 in Pet Supplies)\n#32 in Dog Double Leashes\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eCustomer Reviews:\u003c\/strong\u003e 4.4 \n4.4 out of 5 stars\n   (106)\u003c\/li\u003e\n\u003c\/ul\u003e","brand":"LEOSASA","offers":[{"title":"Default Title","offer_id":49172638269699,"sku":"B0F1XWHZNX-color-green","price":26.54,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0828\/3760\/2563\/files\/41P3fh3YCTL.jpg?v=1783195757","url":"https:\/\/pawmaris.us\/products\/double-dog-leash-no-tangle-splitter-for-two-dogs-coupler-with-adjustable-long-lead-rope-dual-control-handles-retractable-no-pull-bungee-walk-train-small-medium-large-2-pets-green-color-green","provider":"Pawmaris","version":"1.0","type":"link"}